Kubla Cubed User Manual
The strip element is used to remove a fixed thickness of material from an area of the site. This element is most commonly used for stripping topsoil at the start of a project, and for making subgrade adjustments.
The properties that are exposed for the strip element are summarised below.
![]() |
|
![]() |
Topsoil Stripping looks at using the strip element to complete topsoil stripping operations and explains the importance of always having the strip depths defined on a different phase to subsequent earthwork elevations. |